Reactor Readouts
Reactor Output
0MW
Core Temperature
18°
Shield Stress
0%
Shield Integrity
100%
Pressure
0kPa
Radiation
NONE
Startup / Shutdown
Controls
Power Surge Emergency Control
⚡ POWER SURGE ACTIVE
Green Crystal Temperature Boost
Charged
Used 0x today
Stabilizers
Mainframe / Grid
Control Panel
Primary Grid
Storage C
0 filled
Administration External Access
Test messages only appear in the A.C.E.S. log's admin channel — on-site, a test is indistinguishable from a real SDP.
A.C.E.S. Log
Social Standing
Socio-Endangerment: Level 0
Salary Deduction: £0